The operation of the water well drilling rig requires the operation of professionals, because the professionals have a better understanding of the performance of the water well drilling rig. And also have certain operating experience, the following editor will talk about maintenance measures with you.
Details

Measures in use of water well drilling rigs during running-in period

 

    The operation of the water well drilling rig requires the operation of professionals, because the professionals have a better understanding of the performance of the water well drilling rig. And also have certain operating experience, the following editor will talk about maintenance measures with you.

 

    1. The operator should accept the training and guidance of the manufacturer, have a full understanding of the structure and performance of the drilling rig, and obtain certain operation and maintenance experience before operating the machine. The product maintenance manual provided by the manufacturer is the necessary information for the operator to operate the equipment. Before operating the machine, be sure to read the maintenance manual first, and operate and maintain according to the requirements of the manual.

 

    2. Pay attention to the work load during the run-in period. Generally, the work load during the run-in period should not exceed 80% of the rated work load, and a suitable workload should be arranged to prevent the occurrence of overheating caused by the continuous operation of the machine for a long time.

 

    3. Pay attention to frequently observe the indications of various instruments. If there is any abnormality, stop the machine in time to eliminate it. If the cause is not found and the fault is not eliminated, the operation should be stopped.

 

    4. Pay attention to frequently check the level and quality of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water), and pay attention to check the sealing of the whole machine. During the inspection, it is found that there is too much oil and water shortage, and the reason should be analyzed. At the same time, the lubrication of each lubrication point should be strengthened. It is recommended that during the running-in period, grease should be added to the lubrication point in each shift (except for special requirements).

 

    5. Keep the machine clean, adjust and fasten loose parts in time to prevent the parts from being worn out or lost due to loosening.

 

    6. After the running-in period is over, the machine should be subject to compulsory maintenance, inspection and adjustment should be done, and attention should be paid to the replacement of oil.

 

In short, the requirements for the use and maintenance of water well drilling rigs during the running-in period can be summarized as: reducing load, paying attention to inspection, and strengthening lubrication. As long as you pay attention to and implement the maintenance and maintenance of the construction machinery during the running-in period as required, it will reduce the occurrence of early failures, prolong the service life, improve the operation efficiency, and bring you more economic benefits.

 